
Data Centres
A data hall measures a generator in seconds of transfer time and milliseconds of voltage sag, not in kVA.
- N+1 or 2N configuration designed with your electrical consultant
- Transfer under ten seconds, with the switchgear sequence witnessed at test
- Low-vibration skids and acoustic treatment for occupied buildings
500 kW to 2000+ kW, paralleled and containerised







